Need help ASAP. Do I need to submit Aircon installation report to HDB within 14 days after aircon installations(http://www.hdb.gov.sg/cs/infoweb/res...allation-works) or does it apply only to certain groups of flats? I ask abt the report submission but the installer say there's no need for that. My flat is 20 yrs old and came with the 20amp power point.