To share my house reno progress since i gotten the keys officially on the 26th May 2016(May 2013 BTO Launch)..
Design is mostly wife's idea while i see if it's feasible or not. All done by my contractor who is also my wife's friend so although i can pass you his contact if anyone is keen, i cant give u exact breakdown cost of reno items cos got friendship price for some portion, can provide ballpark figure excluding lightings.
Damn long wait thou and the hectic renovation progress, buying the appliances, arranging for delivery to overseeing installation + cleaning.
Officially moved in on 22nd July(Siam 7th lunar month + my parents place started toilet HIP 1 day after i move), maybe got time go back help them clean clean abit..Left my Dyson cordless with them for this period.
As per all gan chiong future flat owners, we did a weekly walk to the bto site(3km away) around late 2015 when the blk was in it's final stages.
And during one of the trip, we manage to sneak in.
Pictures taken using iPhone so perspective is different from post to post.
The Living Rm, BR2 on the left.
Service yard
Circuit breaker utility box. fibre optic, low end Legrand switches use for the whole house. RJ45 ready with 6 points(2 in living, 1 in each bedroom, 1 in bomb shelter).
Bedroom 2
MBR
View to living from MBR
Entrance to kitchen
Walkway to MBR, BR1 and common toilet
Design is mostly wife's idea while i see if it's feasible or not. All done by my contractor who is also my wife's friend so although i can pass you his contact if anyone is keen, i cant give u exact breakdown cost of reno items cos got friendship price for some portion, can provide ballpark figure excluding lightings.
Damn long wait thou and the hectic renovation progress, buying the appliances, arranging for delivery to overseeing installation + cleaning.
Officially moved in on 22nd July(Siam 7th lunar month + my parents place started toilet HIP 1 day after i move), maybe got time go back help them clean clean abit..Left my Dyson cordless with them for this period.
As per all gan chiong future flat owners, we did a weekly walk to the bto site(3km away) around late 2015 when the blk was in it's final stages.
And during one of the trip, we manage to sneak in.
Pictures taken using iPhone so perspective is different from post to post.
The Living Rm, BR2 on the left.
Service yard
Circuit breaker utility box. fibre optic, low end Legrand switches use for the whole house. RJ45 ready with 6 points(2 in living, 1 in each bedroom, 1 in bomb shelter).
Bedroom 2
MBR
View to living from MBR
Entrance to kitchen
Walkway to MBR, BR1 and common toilet
Last edited: