View Single Post
Old 02-12-2010, 10:05 AM   #1863
thesingingbard
Master Member
 
Join Date: Nov 2008
Posts: 3,116
If u change the quipment first, and rerun the pipes later, the cost is much higher. if changing pipes is not a big hassle (no concealed piping), change the pipes with the equipment.
expert is here.
thesingingbard is offline