I just collected my keys today. The whole process took 2 hours! I checked with my CRM on cement screeding. They can check on their system if your project is eligible or not and she told me I’m able to do.

Went to nearest HDB, she gave me a form to fill up and said that I’ll get a call within 3 days to confirm the date cement screeding. But she said not so soon as got “long queue”.

Thank you for the information. Do you call and ask your CRM with regards to the floor screeding? Since my project is not done yet, I wonder when I can apply for the floor screeding. :s13::s13:
 

Erinlmh

Member
Joined
Oct 17, 2014
Messages
424
Reaction score
0
She quoted me 10k for vinyl w/o screeding, 9k for kitchen.. i think i must run away :s13:

:eek::eek: 10k for vinyl is way too ex ba... So far I heard ppl said about 3k without floor screeding for 4 room flat (3 bedrooms and living only) using vinyl.
 

Erinlmh

Member
Joined
Oct 17, 2014
Messages
424
Reaction score
0
8-9k for cabinet!!! this one really trying to chop you...

My price for cabinets below for you all de reference. If u all find cheaper dont tell me... lol... :s13::s13::s13:.. but then also must see workmanship la..

Kitchen To supply materials and labour to fabricate additional kitchen cabinet with laminated finish c/w ABS trimming for door - 26 ft $ 3,900.00

To supply materails and labour to install Quartz work top for kitchen cabinet - 16 feet $ 1,760.00

To supply materials and labour to install colour glass backing between top and bottom kitchen cabinet 18 sqft $ 324.00

Sounds cheap. Mine which was about 6 years ago quoted me these :

Construct 50mm kitchen cabinet mortar base comes with side tiling work - $250

Construct 50mm fridge mortar base comes with full tiling work - $100
Construct 50mm washing machine mortar base comes with full tiling work - $100

Design, fabricate & install Kitchen Cabinet (Bottom) in selected laminate
finish c/w followings :-
- internal white PVC finish
- ABS door trimming
- Shelf panel
- Drawing
- Soft closing hinges
- Install hood & Chimney (provided by owner)
- 1 tier stainless steel dish drainer at Sink area
- 1 set of wooden frame sand-blasted glass panel
- Length : 44ft = $4840

Install Solid surface top for Kitchen Bottom Cabinet Worktop
- Length : 22ft = $1650

Overall total for the kitchen cabinet for 44ft is $6940
 

Amex^1234

Member
Joined
Jul 8, 2014
Messages
492
Reaction score
0
Sounds cheap. Mine which was about 6 years ago quoted me these :

Construct 50mm kitchen cabinet mortar base comes with side tiling work - $250

Construct 50mm fridge mortar base comes with full tiling work - $100
Construct 50mm washing machine mortar base comes with full tiling work - $100

Design, fabricate & install Kitchen Cabinet (Bottom) in selected laminate
finish c/w followings :-
- internal white PVC finish
- ABS door trimming
- Shelf panel
- Drawing
- Soft closing hinges
- Install hood & Chimney (provided by owner)
- 1 tier stainless steel dish drainer at Sink area
- 1 set of wooden frame sand-blasted glass panel
- Length : 44ft = $4840

Install Solid surface top for Kitchen Bottom Cabinet Worktop
- Length : 22ft = $1650

Overall total for the kitchen cabinet for 44ft is $6940

wa!! 22ft table top... ur kitchen is HUGE!
 

zidmosby

Senior Member
Joined
Jan 27, 2018
Messages
610
Reaction score
0
Thank you for the information. Do you call and ask your CRM with regards to the floor screeding? Since my project is not done yet, I wonder when I can apply for the floor screeding. :s13::s13:

I asked my CRM during the key collection day itself. You can only appeal AFTER you have collected your keys. Anytime before that they will not entertain you.
 

heybuddy

Member
Joined
Mar 26, 2018
Messages
219
Reaction score
0
Just signed with a new id. Unfortunately, didnt sign with amex's friend.

Kitchen 22ft
Whole house window grilles with service yard window
System 4 aircon mitsubishi
Whole house vinyl with screeding
Whole house painting with 4 colors
Washing of whole house
Whole house electrical works with free led lights
Free sink, tap, hood and hob
Haulage included
They quoted me 21k
 

semblady123

Member
Joined
May 28, 2018
Messages
321
Reaction score
0
Sounds cool
I also found one
Slightly higher but includes bedroom cupboard, shoe cabinet covering bomb shelter
Also Mitsubishi aircon 3 units


Just signed with a new id. Unfortunately, didnt sign with amex's friend.

Kitchen 22ft
Whole house window grilles with service yard window
System 4 aircon mitsubishi
Whole house vinyl with screeding
Whole house painting with 4 colors
Washing of whole house
Whole house electrical works with free led lights
Free sink, tap, hood and hob
Haulage included
They quoted me 21k
 

Nur.Azie

Junior Member
Joined
Jun 7, 2018
Messages
53
Reaction score
0
Hi Everyone!!

It's been quite sometime since I last commented here. By the way, I didn't go over to HDB to appeal for floor screed. I heard the waiting time is....long.
What I did was, asking around for the price of cement screed. The lowest was $1699 for 3room flat. But of course need to really ensure the screed is properly done.

For a 3room flat, I'll need atleast est 5k. Way off my budget. So I just stopped thinking about flooring :s13: :s13:

My kitchen cabinet, lightings & window grilles all up. Waiting for ID to update me the completion date. It might be this Friday. Not sure yet tho. So basically, the last thing to do is flooring. Then I can move in already.
 

Amex^1234

Member
Joined
Jul 8, 2014
Messages
492
Reaction score
0
Hi Everyone!!

It's been quite sometime since I last commented here. By the way, I didn't go over to HDB to appeal for floor screed. I heard the waiting time is....long.
What I did was, asking around for the price of cement screed. The lowest was $1699 for 3room flat. But of course need to really ensure the screed is properly done.

For a 3room flat, I'll need atleast est 5k. Way off my budget. So I just stopped thinking about flooring :s13: :s13:

My kitchen cabinet, lightings & window grilles all up. Waiting for ID to update me the completion date. It might be this Friday. Not sure yet tho. So basically, the last thing to do is flooring. Then I can move in already.

Hi 5... i'm waiting for my wardrobe , platform bed , flooring & tv console to be up by weekend... then next week can start cleaning n move in liao..
 

Weeli85

Senior Member
Joined
Nov 25, 2017
Messages
685
Reaction score
203
Just signed with a new id. Unfortunately, didnt sign with amex's friend.

Kitchen 22ft
Whole house window grilles with service yard window
System 4 aircon mitsubishi
They quoted me 21k

System 4 is 5 ticks aircon?
Btu 9k bed room and 12k living room?
 

Amex^1234

Member
Joined
Jul 8, 2014
Messages
492
Reaction score
0
How Long it took u all for Reno loan to be approved once submit ?

3 working days for me.. then 1 week later to receive cheques.

System 4 is 5 ticks aircon?
Btu 9k bed room and 12k living room?

Yea i also want to know.. is it Mit system sys 4 5ticks. and what insulator/pipe they use? 1/2inch armaflex?
I paid mine for 3.9+k for sys4.. run 2 trips. 3 x 9k Btu + 1 x 24k Btu
 

Erinlmh

Member
Joined
Oct 17, 2014
Messages
424
Reaction score
0
wa!! 22ft table top... ur kitchen is HUGE!

Old HDB will have a bigger kitchen:s13::s13: That's why ppl like to stay in my kitchen cos it's big and very windy as it is facing the lake opp. We are very comfortable with this 5 room flat with 116sqm. When downgrade to 4 room I wonder how manz....:(:(
 

Erinlmh

Member
Joined
Oct 17, 2014
Messages
424
Reaction score
0
I asked my CRM during the key collection day itself. You can only appeal AFTER you have collected your keys. Anytime before that they will not entertain you.

Thanks for the information. I will be going for an appointment on this weekend to pay the 10% deposit. Wanted to ask CRM on the day. Thanks for the details.
 

Erinlmh

Member
Joined
Oct 17, 2014
Messages
424
Reaction score
0
Just signed with a new id. Unfortunately, didnt sign with amex's friend.

Kitchen 22ft
Whole house window grilles with service yard window
System 4 aircon mitsubishi
Whole house vinyl with screeding
Whole house painting with 4 colors
Washing of whole house
Whole house electrical works with free led lights
Free sink, tap, hood and hob
Haulage included
They quoted me 21k

Wanted to ask you, quotation for : -
Kitchen is both top + bottom is it?
Means you don't have to purchase aircon separately? Good deal
You no need Wardrobe for the rooms? Buy ready made ones?
Hood and Hob also no need to buy?
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ. Forum members and moderators are responsible for their own posts.

Please refer to our Community Guidelines and Standards, Terms of Service and Member T&Cs for more information.
Top