HWZ Forums

Login Register FAQ Mark Forums Read

Parc Life EC

Like Tree256Likes
Reply
 
LinkBack Thread Tools
Old 16-04-2018, 09:22 PM   #1441
Junior Member
 
Join Date: Feb 2018
Posts: 39
A mega 12 hectare community hub near to 5 min walk to Sembawang MRT will begin construction in 2nd half 2018 will be completed by 2021.

This hub will comprise Polyclinic, hawker centre, mega Swimming pool with natural features, child care, eldercare Centres, tennis, Badminton, multipurpose courts, forest trails, library, sports stadium and many still planning in the pipelines within this mega hub. Kindly share within our PARC Life Neighbours.
Wow! Which part of sembawang would it be at? Don’t recall seeing any huge plot of land near the mrt. I suppose it’s the other side not near to parc life?
paddlepop88 is offline   Reply With Quote
Old 16-04-2018, 09:28 PM   #1442
Junior Member
 
Join Date: Feb 2017
Posts: 11
Rule of thumb

One hectare is approx equivalent to 1 Soccer field.

General guide.
Parc Life is offline   Reply With Quote
Old 16-04-2018, 10:21 PM   #1443
Member
 
Join Date: May 2016
Posts: 286
I think you refer to where current Furen international school is. Donít think it will be that fast. Itís one of the projects similar to Waterway Park to integrate sports and community. MP ever mentioned that it will only be constructed when the population in the area reaches a critical mass.

By the way, itís directly opposite visionnaire EC, across the road
pelangi15 is offline   Reply With Quote
Old 16-04-2018, 10:45 PM   #1444
Junior Member
 
Join Date: Apr 2018
Posts: 35
If it is a temple, all residents will be greatly affected. And even worst, temple near park? Then everyday people go park will not have fresh air anymore because of the burning. Hope govt will reconsider building a temple there as the lives of people will be greatly affected.

Yes next to temple and industry area ...all the best to the fresh air for resident there
Kelcck is offline   Reply With Quote
Old 16-04-2018, 11:37 PM   #1445
Senior Member
 
Join Date: Aug 2011
Posts: 1,365
Yes next to temple and industry area ...all the best to the fresh air for resident there
Everywhere also got industry park.. amk, woodland, Tampines... as long as not heavy type like tuas or jurong island
birmingham123 is offline   Reply With Quote
Old 16-04-2018, 11:46 PM   #1446
mt
Member
 
Join Date: Jan 2000
Posts: 260
Haha, the one selling Sengkang or Sembawang?

Anyway I will be collecting the key tomorrow. All the best to other home seekers! Good luck in finding your dream home!
You are one of the early birds bro...we r collecting ours next week aft checking with lunar calendar haha.. must bring ong lai that day. The Day has finally come

So next will be arranging for utilities and defect inspection..
mt is offline   Reply With Quote
Old 17-04-2018, 06:55 AM   #1447
Member
 
Join Date: May 2016
Posts: 286
You are one of the early birds bro...we r collecting ours next week aft checking with lunar calendar haha.. must bring ong lai that day. The Day has finally come

So next will be arranging for utilities and defect inspection..
Can't wait already, bro...

I didn't check the outdoor facilities like Solidus bro. Just did all the checks on windows, doors, locks, drawers and visual checks on flooring and surface. Found 2 or 3 defects (oven not working, saw wires not connected & magnet for holding bedroom 2 door not as strong as others and lastly top window of master bathroom can't close completely, maybe it's me)

Generally, good experience in key collection. I didn't give a good score on the finishing when asked to do survey since I haven't finished inspection. After inspection for 3 hours, I am quietly satisfied with the unit finishing. This Friday will arrange with contractor to see if he has professional advice to give on defects. If not, I am clear to go for reno...

Last edited by pelangi15; 17-04-2018 at 06:58 AM..
pelangi15 is offline   Reply With Quote
Old 17-04-2018, 08:06 AM   #1448
Junior Member
 
Join Date: Feb 2018
Posts: 39
Can't wait already, bro...

I didn't check the outdoor facilities like Solidus bro. Just did all the checks on windows, doors, locks, drawers and visual checks on flooring and surface. Found 2 or 3 defects (oven not working, saw wires not connected & magnet for holding bedroom 2 door not as strong as others and lastly top window of master bathroom can't close completely, maybe it's me)

Generally, good experience in key collection. I didn't give a good score on the finishing when asked to do survey since I haven't finished inspection. After inspection for 3 hours, I am quietly satisfied with the unit finishing. This Friday will arrange with contractor to see if he has professional advice to give on defects. If not, I am clear to go for reno...
We don’t have to wait for the developer to clear the defects before the reno starts if not will be void? (That’s what I heard for hdb bto, not too sure the process for ECs)
paddlepop88 is offline   Reply With Quote
Old 17-04-2018, 04:22 PM   #1449
Member
 
Join Date: May 2016
Posts: 286
We donít have to wait for the developer to clear the defects before the reno starts if not will be void? (Thatís what I heard for hdb bto, not too sure the process for ECs)
Yes, have to. But from the defects can tell if itís easy to fix or not. Reno also needs time to make the carpentry work, so concurrently both have to process.

Anyway warranty from frasers is 1 year. So long as defect is not due to renovation contractor, then we can still report. But this is oversimplified way of saying as there are always many gray areas
pelangi15 is offline   Reply With Quote
Old 17-04-2018, 10:57 PM   #1450
Supremacy Member
 
flame2000's Avatar
 
Join Date: Sep 2000
Posts: 8,747
Do you know any remaining unit current price?

I still have the launch day prices... but i think not many units left... so up to you
What's the launch day price for a 1001 sqft Viva 3 bedders?
flame2000 is offline   Reply With Quote
Old 18-04-2018, 07:28 AM   #1451
Member
 
Join Date: May 2016
Posts: 286
What's the launch day price for a 1001 sqft Viva 3 bedders?
Which stack you are referring to? There are many units for the 2 layouts B2 and B2a.

For example, stack 24 level 1&2 is 756 psf, $716,300 and level 16 is 827 psf, $827450...
pelangi15 is offline   Reply With Quote
Old 18-04-2018, 07:30 AM   #1452
Member
 
Join Date: May 2016
Posts: 286
Btw, I forgot to ask... is it normal to have booking fees for function rooms and media rooms?

I can't figure out why we need to pay after paying so much for a unit.
pelangi15 is offline   Reply With Quote
Old 18-04-2018, 08:00 AM   #1453
Junior Member
 
Join Date: Feb 2018
Posts: 39
Btw, I forgot to ask... is it normal to have booking fees for function rooms and media rooms?

I can't figure out why we need to pay after paying so much for a unit.
Yes quite normal. How much are the fees?
paddlepop88 is offline   Reply With Quote
Old 18-04-2018, 10:32 AM   #1454
Senior Member
 
Join Date: Sep 2008
Posts: 1,299
Yes quite normal. How much are the fees?
usually $10 per session, probably depends on the MCTS?
Scylla is online now   Reply With Quote
Old 18-04-2018, 12:30 PM   #1455
Master Member
 
Join Date: Jan 2018
Posts: 4,284
Lol
If free , some would abuse it & reserve it just for anything.
This is not free in all condo I stay too.

Btw, I forgot to ask... is it normal to have booking fees for function rooms and media rooms?

I can't figure out why we need to pay after paying so much for a unit.
Mergui219067 is offline   Reply With Quote
Reply
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ. Forum members and moderators are responsible for their own posts.

Please refer to our Terms of Service for more information.


Thread Tools

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are On