
Must look see, study big project mah. If visible, can build rocket in SG. Send all buibuis to work, if explode at least the thick armour can tahan tio hit by debris.Wah song hor
Use gahmen money jet here jet there
1 moment US, 1 moment China
Nao go NZ. Next wk go Europe ζ»ιͺοΌ![]()
Maybe follow trump build simi diamond dome defense systemSG planning to build rocket company siboh?![]()
I entered since $16.70 and has been accumulating with some day trades along the way. Core position remains and will be holding as long the company performs.ts, when did you jeep RKLB? Still got upside anot??
Ya, I remembered this project couple of years back then it went quiet.Last time also got some company say wanna set up spaceport in Singapore...![]()
Maybe pay U.S annual "protection fee" to join golden dome (hypersonic missles early warning detection system).Maybe follow trump build simi diamond dome defense system
Designing rockets is one thing, getting them to fly successfully is another. Just today, Japan had to contract Rocket Lab due to repeated failures of their own launch vehicles. Similarly, Firefly faced a major setback last week when an engine test ended in an explosion that wrecked the test site.the stock exist because of their next gen neutron only ...... electron rocket cannot compete in price against rideshare , they just keep on blowing the trumpet about dedicated orbit justify higher cost than rideshare .... once other startups build more tugs then rideshare + tugs will defeat small dedicated expendables
It's still 100% success rate for these 72 launches.the 72 launches you quoted is total ......... not this year alone , 12
where you got the info from ? ai ?It's still 100% success rate for these 72 launches.
fun to see others doing exact opposite in choices when it comes to cost and reusability
we will see how well they compete in a few years
example
stainless steel can use low tech methods of hammer and welding .... carbon fiber is directly scrap whole thing when damage or flawed in 1 area
second stage balloon tanks are HUNG ! cost and weight penalty shifted towards first stage
moving planar fins , different from fixed on new-glenn
chomper/petal/hungryhippo fairinggreat idea if doesn't increase risk of re-contact when separating
youtube video inside
https://spacenews.com/rocket-lab-updates-neutron-design/