1 less RT if attempted 1 IPPT?

MBBSclinic

Master Member
Joined
Dec 18, 2013
Messages
2,870
Reaction score
0
Thank you for your email.

Please note that you are liable for 19 RT sessions only as you have attempted one IPPT in your IPPT window.

If you need further assistance, please visit NS Portal at www.ns.sg or contact us at 1800-eNSNSNS (1800-3676767). If you are calling from overseas, please dial +65 6567 6767.

We look forward to serving you better.

Best regards,

Ter Kwee Lan (Ms)
Customer Service Officer
NS Call Centre


should attempt 20 ippt = no RT?:s22:
 

Calander

Senior Member
Joined
Jun 11, 2014
Messages
2,319
Reaction score
11
Thank you for your email.

Please note that you are liable for 19 RT sessions only as you have attempted one IPPT in your IPPT window.

If you need further assistance, please visit NS Portal at www.ns.sg or contact us at 1800-eNSNSNS (1800-3676767). If you are calling from overseas, please dial +65 6567 6767.

We look forward to serving you better.

Best regards,

Ter Kwee Lan (Ms)
Customer Service Officer
NS Call Centre


should attempt 20 ippt = no RT?:s22:

Enhancements to NS IPPT Management & Training System - NS News - ns.sg
 

Calander

Senior Member
Joined
Jun 11, 2014
Messages
2,319
Reaction score
11
where it stated?

Is there a change in determining whether NSmen have met their IPT/RT requirement?

NSmen who have failed or defaulted IPPT are liable for RT. NSmen who have defaulted IPPT will be liable for 20 sessions of RT during their 12-month RT window (new system with effect from 1 Sep 14). To differentiate between IPPT failures and defaulters, under the new system, failures will be liable to 20-D sessions (as opposed to 20 sessions), where D is equivalent to the number of IPPT/IPT attempts made in the preceding window.


Don't think you actually read up the article.
 

mgx-alander

Greater Supremacy Member
Joined
Jan 19, 2008
Messages
98,724
Reaction score
15,720
under the new system, failures will be liable to 20-D sessions (as opposed to 20 sessions), where D is equivalent to the number of IPPT/IPT attempts made in the preceding window.

Ur D = 1, cos u attempted ippt once..?

if ur D = 20 means u default.
 

kandinsky

Master Member
Joined
Jan 7, 2015
Messages
4,693
Reaction score
10
under the new system, failures will be liable to 20-D sessions (as opposed to 20 sessions), where D is equivalent to the number of IPPT/IPT attempts made in the preceding window.

Ur D = 1, cos u attempted ippt once..?

if ur D = 20 means u default.

If D = 20 then by right considered met the IPT/RT requirement liao, according to the FAQ.

What I understand from reading it is this:

Failure: Get discount. 20 sessions - No of IPPT/IPT attempts.
Defaulter: No discount. Die die must complete 20 sessions

NSmen who have failed or defaulted IPPT are liable for RT. NSmen who have defaulted IPPT will be liable for 20 sessions of RT during their 12-month RT window (new system with effect from 1 Sep 14).

To differentiate between IPPT failures and defaulters, under the new system, failures will be liable to 20-D sessions (as opposed to 20 sessions), where D is equivalent to the number of IPPT/IPT attempts made in the preceding window.

Enhancements to NS IPPT Management & Training System - NS News - ns.sg
 

Calander

Senior Member
Joined
Jun 11, 2014
Messages
2,319
Reaction score
11
a simple guide to just know, that is you have to take a maximum of 20 sessions in a 2-years period.

which can be either:

a. Yr 1 - 10 IPT
Yr 2 - 10 IPT
Total: 20 IPT/RT

b. Yr 1 - 1 IPT-IPPT only
Yr 2 - 19 RTs


However, if is:

a. Yr 1 - 1 IPPT & Fail only (not under IPT or RT phase)
Yr 2 - 20 RTs

b. Yr 1 - No IPPT (not under IPT or RT phase)
Yr 2 - 20 RTs
 

Successor.

Arch-Supremacy Member
Joined
Mar 5, 2008
Messages
11,620
Reaction score
2,372
Thank you for your email.

Please note that you are liable for 19 RT sessions only as you have attempted one IPPT in your IPPT window.

If you need further assistance, please visit NS Portal at www.ns.sg or contact us at 1800-eNSNSNS (1800-3676767). If you are calling from overseas, please dial +65 6567 6767.

We look forward to serving you better.

Best regards,

Ter Kwee Lan (Ms)
Customer Service Officer
NS Call Centre


should attempt 20 ippt = no RT?:s22:

Just saw the document from MINDEF. So now they change the system meaning to reduction in RT Liao, so disappointing.

If you had attended IPPT or IPT in the previous window, current window will less 1 off for RT.

But I don't get it, if attend 10 IPT, fail have to attend 20-10=10 RT in the following window. If still fail, then have to attend 20 RT in the next window. Meaning now is every 2 years will take 20 RT or only for transition phase?

I am waiting for 1st Apr to take the new IPPT
 
Last edited:
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.
Top