8-Year Wait For Yishun BTO Sparks Frustration Online

tauntme

Arch-Supremacy Member
Joined
May 15, 2011
Messages
11,132
Reaction score
4,137
how do they even lock in their suppliers and their rates for a project to be completed in close to a decade
 

Acyyyy

Supremacy Member
Joined
Jan 9, 2023
Messages
5,899
Reaction score
13,362
not much reno.... just paint, then do kitchen cabinet and wardrobe. about 8k+
if need to do floor tiles, tv cabinet, kitchen door etc.... then more expensive.
Bathroom need do ba? Yours have default flooring?
 

FT PRIDE

Arch-Supremacy Member
Joined
Mar 26, 2013
Messages
15,849
Reaction score
938
i have no idea… it doesn’t benefit anyone, not even the contractor or hdb, to purposely delay the completion. so there must be valid reasons why this BTO is taking so long to finish.
Contract period is 2029.. so is there incentives for contractor to complete early? Bto on average takes about 4 years to complete. We should see them start working soon for this Yishun project.

The question would be why hdb gave long time frame for those 2022 projects.
 

thyler_koh

Supremacy Member
Joined
Mar 10, 2001
Messages
7,232
Reaction score
3,192
Google reviews also showed many other unhappy comments.

One said that she and her husband had applied before they got married. “Now, I’m a mum and my kid has already started schooling, but my house isn’t completed yet,” she said.

“This Vanda Breeze project is getting from bad to worse. How can it be stretched for seven to eight years while they have been saying HDB should be finished in less than three years?” read an angry comment.


I really hope those who complained vote for the useless party
 

wongminmin

High Supremacy Member
Joined
Nov 10, 2014
Messages
29,998
Reaction score
15,074
Bathroom need do ba? Yours have default flooring?
no need.
this 1 ur 1.... all included inside the bto package.
  • Vinyl strip flooring in the:
    • Living/ dining
    • Bedroom
  • Floor tiles in the:
    • Bathroom
    • Household shelter
    • Kitchen
  • Wall tiles in the:
    • Bathroom
    • Kitchen

my bedroom and living room is kosong flooring, need to do pay extra 2k++ to do ocs vinyl flooring. :(
 

Acyyyy

Supremacy Member
Joined
Jan 9, 2023
Messages
5,899
Reaction score
13,362
no need.
this 1 ur 1.... all included inside the bto package.
  • Vinyl strip flooring in the:
    • Living/ dining
    • Bedroom
  • Floor tiles in the:
    • Bathroom
    • Household shelter
    • Kitchen
  • Wall tiles in the:
    • Bathroom
    • Kitchen

my bedroom and living room is kosong flooring, need to do pay extra 2k++ to do ocs vinyl flooring. :(
Ohhhh thanks for checking. Like that you will move in earlier than me? Lol gxgx
 

kleong

Great Supremacy Member
Joined
Oct 25, 2005
Messages
55,770
Reaction score
47,899
Lol you will come or not first ~
Got house warming gift or not? 🤣

Got buffet sure appear. House warming gift ah? One 财神爷 poster to paste on the front door can? Or you prefer figurine?
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ. Forum members and moderators are responsible for their own posts.

Please refer to our Community Guidelines and Standards, Terms of Service and Member T&Cs for more information.
Top