Filling productivity

psyger-zero

Arch-Supremacy Member
Joined
Nov 15, 2024
Messages
12,054
Reaction score
10,956
Prior to my previous thread,we are all required to fill whatever we have done on an excel at a shared space,daily. We are told if we don't do that the management will take it we did nothing n affect our bonus n increments. This is despite they knowing clearly how overloaded we are n that if we are even absent for a day,escalations will flood non stop. We barely have time to finish our work n clear all inquiries,let alone fill what productivity.
 

shawntyq

High Supremacy Member
Joined
Mar 6, 2007
Messages
49,765
Reaction score
1,982
Micromanage lol red flag. If you need to report what you have done then why have managers? I think they want find reasons to retrench ppl soon?
 

psyger-zero

Arch-Supremacy Member
Joined
Nov 15, 2024
Messages
12,054
Reaction score
10,956
Micromanage lol red flag. If you need to report what you have done then why have managers? I think they want find reasons to retrench ppl soon?
They can see the emails we sent n the reports we saved n all that. Yet still need this. I try to do as n when I can. But last 3 weeks,ie the time I really broke down n felt like quitting,was a particularly terrible period where there was so much work n ppl off on reservist or mc. We are so understaffed n they still can do n say this.
 

shawntyq

High Supremacy Member
Joined
Mar 6, 2007
Messages
49,765
Reaction score
1,982
They can see the emails we sent n the reports we saved n all that. Yet still need this. I try to do as n when I can. But last 3 weeks,ie the time I really broke down n felt like quitting,was a particularly terrible period where there was so much work n ppl off on reservist or mc. We are so understaffed n they still can do n say this.
Personally I would have alre look out elsewhere long time ago if always understaffed. Want save cost but at the expense of the employee health.
 

simon_84

Arch-Supremacy Member
Joined
Mar 14, 2008
Messages
11,106
Reaction score
1,162
In tech industry, if you are in an agile team, the scrum master will ask you to fill up the kanban or scrum board to track the tasks on hand for 2 weeks.
This is most used in local banks to track productivity of each team by the division HR, failure to fill in can result in being asked to leave or redeploy to another busier team.

On the sme side for SI industry, need to fill in time sheet to make sure that you are occupied with projects 80% of the month.
Failure to fill in can result in lower performance bonus.

In the back office side for a local securities firm, need to fill in excel to state which corporate action I was working on to ensure work load is equally distributed within the ops team.

So just go through motion and fill in before the start of each day.
 

EdenHazard

High Supremacy Member
Joined
May 28, 2012
Messages
46,428
Reaction score
12,801
Usually people that complain are those that do nothing and scared to pichar lobang
 

Song Bro

Supremacy Member
Joined
Aug 30, 2024
Messages
5,164
Reaction score
2,846
Chinese saying: 解决不了问题,还解决不了提出问题的人?
Need TS to exploit his charisma to the fullest.
牺牲小我,成就大家 ba.
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.
Top