Jul 2012 BTO

Arbalest

Arch-Supremacy Member
Joined
Aug 4, 2001
Messages
16,410
Reaction score
696
I dont really like 705/707. Coz is facing the road.
How about u ? any unit u aim ? :)

Haha.. high floor should solve that problem right? And I think the view could be even better as you are not facing the waterway from a perpendicular pt of view

For my wife and I, no requirement at all.. we are happy to have a good house in a good location :)
 

yvette

Member
Joined
Feb 9, 2009
Messages
195
Reaction score
0
Last Queue Number invited for selection of a 4-Room flat in Bukit Merah under the July 2012 BTO exercise as at 10 Sep 2012 : 00032

11 pax drop out?
 

Falcon16

Junior Member
Joined
Aug 31, 2012
Messages
47
Reaction score
0
any one has any opinions on whether or not to get the OCS? Cheaper to get the reno and doors done ourselves?
I heard the OCS tiles which is priced at $5,000 is not that cheap. And you can buy your own tiles and pass them to the contractor during renovation. This will further reduce your renovation costs. As for the doors, we didnt't like the HDB provided colors. So in the end I didn't select both.
 

Falcon16

Junior Member
Joined
Aug 31, 2012
Messages
47
Reaction score
0
Sounds like a plan! And please don't get me wrong, I'm not trying to pour cold water in any way. Am waiting to select my flat, and trying to put the various considerations into place. :)
No worries. You have a good point and I realized the eatery was next door. Judging from the shape and size of it, I supposed it will be indoors and many of the newer eateries.

Happy Selection!
 

wilfred

Member
Joined
Jan 1, 2000
Messages
299
Reaction score
0
Haha.. high floor should solve that problem right? And I think the view could be even better as you are not facing the waterway from a perpendicular pt of view

For my wife and I, no requirement at all.. we are happy to have a good house in a good location :)


High floor will have worse noise problem from road. It's louder and the noise is continuous.




Punggol Waterway West | Facebook
 
Last edited:

kennytan1976

Banned
Joined
Mar 30, 2011
Messages
877
Reaction score
0
High floor will have worse noise problem from road. It's louder and the noise is continuous.

Noise problem better than YOU desperate beggar spammer !
Whether high floor or low floor none of your / mine business !

You Still stubborn of not rectifying your live link in your post ! :s8:
 

HunterXtreme

Member
Joined
Jun 16, 2001
Messages
405
Reaction score
0
on a side note, can any one advise on this piece? I've recently left my job, and am in the midst of looking for another one. My last pay slip is in Aug. How will this affect the loan from hdb? Also, i understand i have to declare and sign a statutory declaration of the status. What's the impact on this?

It will not impact whether they will approve your HDB loan. However, it may affect the maximum amount of money they are willing to loan you. You will also not be able to apply for the additional housing grant (AHG) unless you have at least 12 months of continuous work, eg July 11 to Aug 12.
 

cardiomyocytes

Junior Member
Joined
Sep 1, 2012
Messages
9
Reaction score
0
Last Queue Number invited for selection of a 4-Room flat in Bukit Merah under the July 2012 BTO exercise as at 10 Sep 2012 : 00032

11 pax drop out?

Yup. 8 dropped out of the first 11 numbers. Dont know why though. But from no. 25-32, there was full selection.
 

cardiomyocytes

Junior Member
Joined
Sep 1, 2012
Messages
9
Reaction score
0
It will not impact whether they will approve your HDB loan. However, it may affect the maximum amount of money they are willing to loan you. You will also not be able to apply for the additional housing grant (AHG) unless you have at least 12 months of continuous work, eg July 11 to Aug 12.

What if there was a one month break in between due to change of job? Ie. Jul 11- Nov 11 in Job 1, then Jan 12 - Aug 12 in Job 2. Will we still be eligible for AHG?
 

RedShoe

Member
Joined
Mar 11, 2007
Messages
270
Reaction score
0
High floor will have worse noise problem from road. It's louder and the noise is continuous.




Punggol Waterway Cascadia | Facebook

I read many posts saying that sound travels upwards but I still cannot understand why the higher floors will get worse noise problem.

Is it a fact that lower floors like 2nd to 5th floors will experience less noise than maybe 10th to 15th floor??

Doesn't really make sense to me.
 

Juniorbear

Junior Member
Joined
Sep 11, 2012
Messages
8
Reaction score
0
yes, i think so... :s13:

think there is no selection today too.

Don't think there is continuous selection for this project. They seem to be cramming in 6 to 8 people per day on those selection days.

My number is 63x which is all the way till mid-nov. Then again, mine's out of range so chances are probably crap.
 

cokiee

Senior Member
Joined
Sep 6, 2012
Messages
1,158
Reaction score
0
I heard the OCS tiles which is priced at $5,000 is not that cheap. And you can buy your own tiles and pass them to the contractor during renovation. This will further reduce your renovation costs. As for the doors, we didnt't like the HDB provided colors. So in the end I didn't select both.

That's what I read about the tiles as well, and additionally for that price one might be able to get homogeneous tiles which are apparently more durable and all. Downside is that you'll be paying for the price in 4 years.

It will not impact whether they will approve your HDB loan. However, it may affect the maximum amount of money they are willing to loan you. You will also not be able to apply for the additional housing grant (AHG) unless you have at least 12 months of continuous work, eg July 11 to Aug 12.

I've got that 12 months of continuous work prior to august, so that part is not a problem for me. Assuming that they grant, say.. 200k now, and i get a job next month (which is likely), do you know if i will be abler to get a re-evaluation on this? Matter of bad timing for me imo.

I read many posts saying that sound travels upwards but I still cannot understand why the higher floors will get worse noise problem.

Is it a fact that lower floors like 2nd to 5th floors will experience less noise than maybe 10th to 15th floor??

Doesn't really make sense to me.

Hi RedShoe, this part is quite true if you're living next to a major road - and this is due to the nature of sound as a wave. Anecdotal evidence from where I live next to the CTE suggests that the higher floors have got it louder than I do on the 3rd floor.
 

ketua

Arch-Supremacy Member
Joined
Mar 20, 2001
Messages
19,434
Reaction score
77
I read many posts saying that sound travels upwards but I still cannot understand why the higher floors will get worse noise problem.

Is it a fact that lower floors like 2nd to 5th floors will experience less noise than maybe 10th to 15th floor??

Doesn't really make sense to me.

I'm just guessing, could it be the trees that absorb the sounds at lower floors?
 

yvette

Member
Joined
Feb 9, 2009
Messages
195
Reaction score
0
I'm just guessing, could it be the trees that absorb the sounds at lower floors?

yes i guess so.

i have a colleague who lives near the east coast/aye and stay at lvl 4 not noisy - v cosy n windy because near her balcony is the swimming pool and trees.

while those stay above her hear noise frm the aye...
 

HunterXtreme

Member
Joined
Jun 16, 2001
Messages
405
Reaction score
0
I read many posts saying that sound travels upwards but I still cannot understand why the higher floors will get worse noise problem.

Is it a fact that lower floors like 2nd to 5th floors will experience less noise than maybe 10th to 15th floor??

Doesn't really make sense to me.

I have stayed at both high and low levels.

Higher level, you will get more constant noise but at a lower decibel as noise can get to you from multiple directions but the strength decrease over distance.

Lower level, you will get intermittent noise but at higher decibel because other buildings/trees block out noises from other places so what you heard is mainly noise very near to you (which will be louder).
 

HunterXtreme

Member
Joined
Jun 16, 2001
Messages
405
Reaction score
0
I've got that 12 months of continuous work prior to august, so that part is not a problem for me. Assuming that they grant, say.. 200k now, and i get a job next month (which is likely), do you know if i will be abler to get a re-evaluation on this? Matter of bad timing for me imo.

You do know that this HLE is not the final one right? We will need to apply for another HLE before taking the keys. Yes, there will be another round of re-evaluation so don't worry too much.
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.
Top