1) PD door - Anybody using PD door for their toilets/ kitchen? Besides PD door, any other suggestion?

2) Anybody put exhaust fan / ceiling fan in their toilet? For exhaust fan, need HDB approval?

No i mean, i always lock the service yard door before i leave the house. but whenever i visit the next time, the service yard door is always unlocked. i duno why lol.. but the rest of the windows and doors and all, remains the same..

does the service yard come with door and lock???
 

STOPBANNINGME

Junior Member
Joined
Sep 25, 2017
Messages
97
Reaction score
0
Report defect? My door open because the lock mechanism was faulty, shut because even e lil Window was windy.



Yes my service yard comes with a door and lock lol.. im asking my ID to check for me to see if the mechanism is faulty.. still waiting for his reply. hopefully he comes back with a yes. for the first time, i wish this is a real defect HAHA

Eek. Could it be hdb contractors? Or wind blow?

I didnt engage HDB contractor cause i didnt submit any defects. cause my house's defects are all very minor and my ID says he can settle all that for me. Initially i was thinking if its my ID who opened it. but my renovation haven started only until next week. so apparently he didnt.. i even texted him to ask him look out for me on the service yard's door. he say okay. if he was the one who opened it, he would have told me.. :S:S
 

Yuppie98

Senior Member
Joined
Apr 9, 2017
Messages
926
Reaction score
0
Don’t worry if it is something spectra it’ll go away when u start your reno, these things don’t like noise, just throw some salt around service yard area too.
Most BTO will have because it’s vacant and quiet, they’re not permanent residents.

Yes my service yard comes with a door and lock lol.. im asking my ID to check for me to see if the mechanism is faulty.. still waiting for his reply. hopefully he comes back with a yes. for the first time, i wish this is a real defect HAHA



I didnt engage HDB contractor cause i didnt submit any defects. cause my house's defects are all very minor and my ID says he can settle all that for me. Initially i was thinking if its my ID who opened it. but my renovation haven started only until next week. so apparently he didnt.. i even texted him to ask him look out for me on the service yard's door. he say okay. if he was the one who opened it, he would have told me.. :S:S

 
Last edited:

STOPBANNINGME

Junior Member
Joined
Sep 25, 2017
Messages
97
Reaction score
0
Don’t worry if it is something spectra it’ll go away when u start your reno, these things don’t like noise, just throw some salt around service yard area too.
Most BTO will have because it’s vacant and quiet, they’re not permanent residents.




actually, i threw salt+rice alrdy when i first opened the door. its part of the door opening ceremony. and i threw quite alot LOL kiasu Singaporean :x did you do that for yours after the windows all widely opened incident?

i think i need to do something again. im just afraid my kids will 'see' and 'feel' this things even more cause they say usually kids are more sensitive.. thats why im so worried haiz
 

Yuppie98

Senior Member
Joined
Apr 9, 2017
Messages
926
Reaction score
0
For mine later we discover it’s e lock problem and small window after BSC fix it.
But I do have some experiences in my other properties.
I’m thinking for yours it could be because it’s empty if it’s really not due to wind or faulty door locks. Once there’s humans, or noise it should leave, if it doesn’t you can use oil or totally ignore it, if u don’t ignore it, it might suck energy.
Have u tried iPhone method to determine your suspicion?

actually, i threw salt+rice alrdy when i first opened the door. its part of the door opening ceremony. and i threw quite alot LOL kiasu Singaporean :x did you do that for yours after the windows all widely opened incident?

i think i need to do something again. im just afraid my kids will 'see' and 'feel' this things even more cause they say usually kids are more sensitive.. thats why im so worried haiz

 
Last edited:

STOPBANNINGME

Junior Member
Joined
Sep 25, 2017
Messages
97
Reaction score
0
For mine later we discover it’s e lock problem and small window after BSC fix it.
But I do have some experiences in my other properties.
I’m thinking for yours it could be because it’s empty if it’s really not due to wind or faulty door locks. Once there’s humans, or noise it should leave, if it doesn’t you can use oil or totally ignore it, if u don’t ignore it, it might suck energy.
Have u tried iPhone method to determine your suspicion?




Ahh.. i see..

So you mean if i failed to be able to ignore 'it' then it will suck my energy due to my fear? omg. what do you mean by using oil? what to do using oil haha
 

IAmZlatan

Member
Joined
Jan 8, 2018
Messages
197
Reaction score
18
Hello all!

I went to check around the childcare centres last afternoon at:

1) My First Skool @ Keat Hong Quad Blk 815A
2) Sparkletots @ Keat Hong Axis Blk 807C
3) Ichiban Montessori @ Keat Hong Pride Blk 805C

But out of 3 of them, only Ichiban Montessori can tell me the registrations available date and school fees. The other 2 preschools asked me to register online but I am not able to do it via ECDA link as my daughter is only 1year 3months now. Not sure is it because I duno how to do it haha.. Anyone had your child sent to any of the above preschools above? Can share with me your experience and thoughts on the school? This is my first time doing this and i am very lost. Please guide me.. Really appreciate it!!

Wrong thread?
 

Mekyuu

Junior Member
Joined
Jan 29, 2018
Messages
20
Reaction score
0
Just an update. Was informed by my hdb branch that defect rectification will take at least a month. How long was yours? I ended up having to postpone the screeding date.
 

binchotan

Member
Joined
Sep 11, 2011
Messages
146
Reaction score
0
Just an update. Was informed by my hdb branch that defect rectification will take at least a month. How long was yours? I ended up having to postpone the screeding date.

BSC left your area already and now you are liaising directly with hdb on your defects?
 

smiggleprincess

Junior Member
Joined
Feb 6, 2018
Messages
56
Reaction score
0
Just an update. Was informed by my hdb branch that defect rectification will take at least a month. How long was yours? I ended up having to postpone the screeding date.

omg
so long
alot of defects?
like that reno will drag..
oh dear... i plan two mths only
 

Mekyuu

Junior Member
Joined
Jan 29, 2018
Messages
20
Reaction score
0
BSC left your area already and now you are liaising directly with hdb on your defects?
Yeah. Going through hdb branch itself and liasing with hdb contractor. Also, i read that we are suppose to go up to the unit with them to go through list of defects, but that never happened. When i dropped by the unit 2 weeks after submitting, i realized that it was already mid process. Was informed by the hdb branch that for every defect, they require to call up different people, wall need call wall people, window need call window people and such.

omg
so long
alot of defects?
like that reno will drag..
oh dear... i plan two mths only
Not sure if it is considered a lot? Most of it are common defects like grout issue, window hinges rusty, water seepage and such. Just that my front door is not level and tilted such that the top is eating into the door frame and caused scratches and the bottom of the door is jutting out(assuming it is rare as i don't see others mentioning this before) Oh, and my bomb shelter's door can't lock.

I was planning for 2 months as well. But 6 more days to 1 month, so i doubt it is possible now for me. Hopefully your BSC still around then will be much faster?
 

rody2k

Junior Member
Joined
Apr 1, 2001
Messages
20
Reaction score
0
Normally after submitting the defect list to HDB branch, how many days will the contractor call you after that?

Cause the HDB officer said after 2 days contractor will call up, but I have been waiting for more than 1 week.

Tried to call the contractor but didn't pick up. Now my ID is waiting for them.
 

Mekyuu

Junior Member
Joined
Jan 29, 2018
Messages
20
Reaction score
0
Normally after submitting the defect list to HDB branch, how many days will the contractor call you after that?

Cause the HDB officer said after 2 days contractor will call up, but I have been waiting for more than 1 week.

Tried to call the contractor but didn't pick up. Now my ID is waiting for them.

My contractor didn't call at all and didn't pick up any of my calls. I went down to the branch to complain after 2 weeks and they said they will get the contractor to contact me, took him almost 1 week to call back after that. So to answer your question, mine took 3 weeks.
 

rody2k

Junior Member
Joined
Apr 1, 2001
Messages
20
Reaction score
0
Thank you :sad:

My contractor didn't call at all and didn't pick up any of my calls. I went down to the branch to complain after 2 weeks and they said they will get the contractor to contact me, took him almost 1 week to call back after that. So to answer your question, mine took 3 weeks.
 

binchotan

Member
Joined
Sep 11, 2011
Messages
146
Reaction score
0
Yeah. Going through hdb branch itself and liasing with hdb contractor. Also, i read that we are suppose to go up to the unit with them to go through list of defects, but that never happened. When i dropped by the unit 2 weeks after submitting, i realized that it was already mid process. Was informed by the hdb branch that for every defect, they require to call up different people, wall need call wall people, window need call window people and such.

Ya every defects will have to be done by different trade of contractors. bsc will not help you to supervise the contractors but they will give you a call once everything is done before you can go up to check the unit again. You can ask them for joint inspection and that is what im doing so it will not be a 1 or 2 times issue.

But if you do not mind minor issue after defects being done up and you have your own id or contractor to do work for you, then you can get them to touch up here and there for you....otherwise you will have to monitor yourself and it will takes up alot of time.
 

pandanwaffles

Junior Member
Joined
Sep 15, 2017
Messages
35
Reaction score
0
Ya every defects will have to be done by different trade of contractors. bsc will not help you to supervise the contractors but they will give you a call once everything is done before you can go up to check the unit again. You can ask them for joint inspection and that is what im doing so it will not be a 1 or 2 times issue.

But if you do not mind minor issue after defects being done up and you have your own id or contractor to do work for you, then you can get them to touch up here and there for you....otherwise you will have to monitor yourself and it will takes up alot of time.

Haha that's true! I have to contact window, door, screeding contractors separately..quite a hassle
 

pandanwaffles

Junior Member
Joined
Sep 15, 2017
Messages
35
Reaction score
0
For those who appealed to hdb for screeding, may I know how much the contractor quoted for top up? 40mm is not enough.. thks!
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.