xuan87
Senior Member
- Joined
- May 1, 2007
- Messages
- 2,373
- Reaction score
- 2
My current rig is on the right.
My long term plan is to change to a Skylake/Kaby lake or Zen setup with multi core and hyperthreading, and stay with that rig for the next 5 years. I want to do it with a mitx rig, first year air cooled, second or third year onwards I'll do a custom water cooling loop set up. Want to be fully prepared for DX12 gaming.
But if I want to get my CPU with a discount, I'm potentially looking at a 1-1.5 year wait, given that Zen will only be announced in Q1 2017.
My i5 2500 should still be good for the entire next year, so I'm just thinking of getting a 1155 mitx motherboard, then recycling the majority of my parts over to the new board and new case.
Anyone knows if this is a good or bad idea, and if it's even still possible to get a 1155 mitx board?
My long term plan is to change to a Skylake/Kaby lake or Zen setup with multi core and hyperthreading, and stay with that rig for the next 5 years. I want to do it with a mitx rig, first year air cooled, second or third year onwards I'll do a custom water cooling loop set up. Want to be fully prepared for DX12 gaming.
But if I want to get my CPU with a discount, I'm potentially looking at a 1-1.5 year wait, given that Zen will only be announced in Q1 2017.
My i5 2500 should still be good for the entire next year, so I'm just thinking of getting a 1155 mitx motherboard, then recycling the majority of my parts over to the new board and new case.
Anyone knows if this is a good or bad idea, and if it's even still possible to get a 1155 mitx board?

