8-Year Wait For Yishun BTO Sparks Frustration Online

Coless

Senior Member
Joined
Mar 8, 2013
Messages
1,334
Reaction score
238
Contract period is 2029.. so is there incentives for contractor to complete early? Bto on average takes about 4 years to complete. We should see them start working soon for this Yishun project.

The question would be why hdb gave long time frame for those 2022 projects.

if a bto can be completed in 4–5 years, why would the contractor purposely delay it to 8 years? if i were the contractor, i'd want to finish the job quickly, collect full payment, and move on to the next project.
 

Ethan_

Great Supremacy Member
Joined
Sep 27, 2007
Messages
60,983
Reaction score
9,565
based on the address of their current residence lah
If they already applied for the flat, can use that address or not, even if haven't move in? It make practical sense since if get the flat that home would be much closer to the school. Easier for the kid.
 

lampano

High Supremacy Member
Joined
Jan 9, 2007
Messages
25,144
Reaction score
9,044
at least they got it at 2022 prices leh
if bring fwd, wanna bring fwd /increase the hdb selling price mah? :s22:

but truth be told, its really slow.
the bto near me, flat ground dec 2024, now today already 23floor :s13:
 

Coless

Senior Member
Joined
Mar 8, 2013
Messages
1,334
Reaction score
238
If they already applied for the flat, can use that address or not, even if haven't move in? It make practical sense since if get the flat that home would be much closer to the school. Easier for the kid.

how is it easier for the kid? if the parents are staying in the west now but the new BTO is in the east, wouldn't it actually be easier after they move into their new home? and technically, you're supposed to be staying at the registered address , not just using it to enrol in the school.
 

Capitalist

High Supremacy Member
Joined
Feb 9, 2006
Messages
43,874
Reaction score
7,440
However, in a purported reply from HDB to one of the homeowners, which was posted on Google reviews, it was stated that the probable completion date for the Vanda Breeze @ Yishun project has always been the 2nd quarter 2029, unchanged since applicants signed on the dotted line.

"The completed timelines were clearly communicated during the Nov 2022 sales launch, and were further reinforced when you made informed decisions to book the 4-room flat." read the response.

Another similar response from a Redditor popped up online, this time explaining that completion times depend on factors like site and soil conditions, design complexity, and number of units.

"When the area opened for balloting it was already stated that TOP is 2028/2029. If you can't wait that long then ballot for what?" another Redditor commented.
 

jericho75

Greater Supremacy Member
Joined
May 24, 2013
Messages
89,847
Reaction score
18,319
However, in a purported reply from HDB to one of the homeowners, which was posted on Google reviews, it was stated that the probable completion date for the Vanda Breeze @ Yishun project has always been the 2nd quarter 2029, unchanged since applicants signed on the dotted line.

"The completed timelines were clearly communicated during the Nov 2022 sales launch, and were further reinforced when you made informed decisions to book the 4-room flat." read the response.

Another similar response from a Redditor popped up online, this time explaining that completion times depend on factors like site and soil conditions, design complexity, and number of units.

"When the area opened for balloting it was already stated that TOP is 2028/2029. If you can't wait that long then ballot for what?" another Redditor commented.


what ppl buay song is why later projects can be faster but earlier projects that gives longer dates due to supply chain and covid measure times still never speed up? since all those restrictions are gone.

these ppl better open their eyes and vote correctly next time.
 

3G SAINT

Arch-Supremacy Member
Joined
Oct 30, 2011
Messages
23,804
Reaction score
3,511
This the latest photo posted yesterday on google maps. The google maps satellite view was from 28 may 2025.

From the photo one of the blk already beginning pilecap works. Estimate pilecap and ground floor takes 2-3 months. Then first floor 1-2 months. 2nd floor onwards about 2 weeks per storey. This project only 14 storey. By next year aug should be able to reach roof level.

If the contractor do not drag should be able to handover end of 2027.



AC9h4nrdTljE_T_WPYyn7WLLFRIUn_zKndcncsBeWP4OQu0aeAWtaIjw7XuSxX-vMG_sKycM1v8wQPmWAkZzj9yz7QyzLIjYF-qpBq0nLAgf7fsBQfAHq92WJScmqexl0GPJ0z4-Ywciy7LhEdEP=s5000-v1
The bto need clear the land and expose to hot sun will be very warm too;)

I saw the land need clear when previously was forest take more time for sure:)

I stayed there not very far but better location cover hot sun:)
 

Coless

Senior Member
Joined
Mar 8, 2013
Messages
1,334
Reaction score
238
what ppl buay song is why later projects can be faster but earlier projects that gives longer dates due to supply chain and covid measure times still never speed up? since all those restrictions are gone.

these ppl better open their eyes and vote correctly next time.

in stomp’s reply, they already mentioned the soil condition and that more time is needed.

instead of just opening their eyes to vote correctly, they should open their eyes and look at the completion dates properly.
 

jericho75

Greater Supremacy Member
Joined
May 24, 2013
Messages
89,847
Reaction score
18,319
in stomp’s reply, they already mentioned the soil condition and that more time is needed.

instead of just opening their eyes to vote correctly, they should open their eyes and look at the completion dates properly.


back in 2020-22 all bto projects got longer dates due to covid measures etc.

nobody build a hdb that needs close to 10 years.

imagine shenzhen if give pap build until now most ppl still farmers.

7e33a80f00e9481aaf9f3302a44831fc.jpg
 

3G SAINT

Arch-Supremacy Member
Joined
Oct 30, 2011
Messages
23,804
Reaction score
3,511
If they already applied for the flat, can use that address or not, even if haven't move in? It make practical sense since if get the flat that home would be much closer to the school. Easier for the kid.
The house upon collect key then consider is yours;)
If you are jobless cannot serve the loan,hdb can forfeit the flat too..
If you do not have enough loan,use cash top up before can collect key....:)if you dnt have $$$ upon collect key,hdb dnt give you key...no $$$ no talk:D
 
Last edited:

Coless

Senior Member
Joined
Mar 8, 2013
Messages
1,334
Reaction score
238
back in 2020-22 all bto projects got longer dates due to covid measures etc.

nobody build a hdb that needs close to 10 years.

imagine shenzhen if give pap build until now most ppl still farmers.

7e33a80f00e9481aaf9f3302a44831fc.jpg
why bring up shenzhen?

if a project needs more time because of certain conditions like soil issues or other site challenges then there’s nothing wrong with a longer construction period. and if delays were due to covid restrictions, which are no longer in place, things should eventually speed up and the project may be handed over earlier.

for now, HDB’s stated completion date remains the same maybe later on, when things are clearer, they can give a more accurate handover date.
 

jeff79

High Supremacy Member
Joined
May 26, 2001
Messages
31,326
Reaction score
1,063
in stomp’s reply, they already mentioned the soil condition and that more time is needed.

instead of just opening their eyes to vote correctly, they should open their eyes and look at the completion dates properly.
The aranda breeze bto beside launched at exactly same time already 8-9 storeys. Same clear forest and similar soil conditions as the delayed site.

From google earth 11 jun 2024 photo, seem like the aranda breeze contractor already doing pile load test.
Started work almost a year earlier.
 

Coless

Senior Member
Joined
Mar 8, 2013
Messages
1,334
Reaction score
238
The aranda breeze bto beside launched at exactly same time already 8-9 storeys. Same clear forest and similar soil conditions as the delayed site.

From google earth 11 jun 2024 photo, seem like the aranda breeze contractor already doing pile load test.
Started work almost a year earlier.

plot twist, they dig halfway then found oil lah. now don’t know want to build BTO or set up oil rig.
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ. Forum members and moderators are responsible for their own posts.

Please refer to our Community Guidelines and Standards, Terms of Service and Member T&Cs for more information.
Top