How's the whole installation process? can share some pics of the final outcome?
I can't recall the sequence as it has been some time. The installers installed the motor and the blind housing after marking the installation spot.
As they will be using hammer drill, be prepared for loud noise.
They then proceed to custom-cut the power cable based on the required length. The power cable will be concealed via trunking.. In my case, I have earlier informed my electrician to install a power point on top of my balcony wall so as to minimise trunking.
After they had ensured the motors are working, they drew the blind down and made markings on the floor. This is for the installation of the rain guard and the purpose is to route rain water from the blinds will not flow to balcony floor.
The last 2 steps were filling up the gaps (rain guard, trunking, blind housing) using silicone and calibration.
The whole process took the entire morning.