carlongerdidu93
Master Member
- Joined
- May 10, 2003
- Messages
- 3,473
- Reaction score
- 4,175
still got the audacity to raise prices and taxes somemore
			
			Just require the House members to pay $10k for every absence in House meeting.
It will be some tiny sum.
How many meetings do they have in a year ?
And they still cannot attend all of the meetings when they are PAID to do it.
Self-appraisal and Self-reward.I rather pay cut 1st n annual vote for mp performanace appraisal - gets bonus or KO.
Stop wasting tax payers $$$$.
I mean residents to vote mp annually for mp bonus or KO.Self-appraisal and Self-reward.
How much reduction can we get ?
They are already getting separate pay for their individual appointments.
(Correct me if I am wrong.)
There is a lot to cut.
I rather pay cut 1st n annual vote for mp performanace appraisal - gets bonus or KO.
Stop wasting tax payers $$$$.
raise what cost? at 9% GST, i am expecting public buses and mrt to be free for pink IC holders as what PAP transport minister Raymond Lim once said.SINGAPORE: Raising rail reliability targets could come at a cost to taxpayers and commuters, said Transport Minister Chee Hong Tat.
The current rail reliability target of 1 million mean kilometres between failure (MKBF) remains a "relevant and valid" target, he said in parliament on Monday (Nov 11).
He was responding to a question by Leader of the Opposition Pritam Singh, who said that the target of 1 million MKBF was set about five years ago, and asked if the Ministry of Transport (MOT) is considering raising the threshold.
Mr Chee said that the 1 million figure was chosen because it represents what the best, most reliable rail operators – such as those in Taipei and Guangzhou – have managed to achieve in their systems.
“If we look at it today, I think it's still a relevant and valid target, something that is useful for us to focus on, and that is something which we will continue to work towards,” he said.
The prospect of raising it further has to be carefully assessed, he added.
“Because there is a trade-off between raising MKBF further and what is the cost incurred, which will then ultimately have to be borne by either taxpayers or commuters,” said Mr Chee.
“So, we will study this carefully.”
Rail reliability was being discussed in parliament in the wake of several MRT and LRT system disruptions in the past months.
https://www.channelnewsasia.com/sin...yzFT8qQZcdExG2sU_k_aem_BrS2iFq6Jqs1PzRYWfa_pA
lolzzzzzThen he is overpay also ask him go kiong kan also.
It will never happen.I mean residents to vote mp annually for mp bonus or KO.
Yes, but 4+ years is too damn long...There's actually a performance appraisal..it's called the elections but people seems to be afraid to use exercise their own rights against poor performing MPs.

Dear huihong,SINGAPORE: Raising rail reliability targets could come at a cost to taxpayers and commuters, said Transport Minister Chee Hong Tat.
The current rail reliability target of 1 million mean kilometres between failure (MKBF) remains a "relevant and valid" target, he said in parliament on Monday (Nov 11).
He was responding to a question by Leader of the Opposition Pritam Singh, who said that the target of 1 million MKBF was set about five years ago, and asked if the Ministry of Transport (MOT) is considering raising the threshold.
Mr Chee said that the 1 million figure was chosen because it represents what the best, most reliable rail operators – such as those in Taipei and Guangzhou – have managed to achieve in their systems.
“If we look at it today, I think it's still a relevant and valid target, something that is useful for us to focus on, and that is something which we will continue to work towards,” he said.
The prospect of raising it further has to be carefully assessed, he added.
“Because there is a trade-off between raising MKBF further and what is the cost incurred, which will then ultimately have to be borne by either taxpayers or commuters,” said Mr Chee.
“So, we will study this carefully.”
Rail reliability was being discussed in parliament in the wake of several MRT and LRT system disruptions in the past months.
https://www.channelnewsasia.com/sin...yzFT8qQZcdExG2sU_k_aem_BrS2iFq6Jqs1PzRYWfa_pA
Rules can be change.It will never happen.
If they dun even attend all the meetings, what more do you expect from them ?
If they cannot do it, dun run.
