Those travelling to Sydney in Oct may want to take note of road closure/diversions
http://www.abc.net.au/news/2015-05-28/sydney-light-rail/6503514
http://www.transportnsw.info/sites/en/transport-status/news/2015/sydney-cbd-bus-network.page
To ease congestion during major construction, which will involve excavation works, the rebuilding of roads and the laying of tracks, a new bus timetable will be introduced on October 4.
The closure of George Street, the main arterial road through the CBD, will mean bus stops will be moved to other bus corridors including Elizabeth, Castlereagh, Park, Druitt, Clarence and Yorks streets.
http://www.abc.net.au/news/2015-05-28/sydney-light-rail/6503514
http://www.transportnsw.info/sites/en/transport-status/news/2015/sydney-cbd-bus-network.page
To ease congestion during major construction, which will involve excavation works, the rebuilding of roads and the laying of tracks, a new bus timetable will be introduced on October 4.
The closure of George Street, the main arterial road through the CBD, will mean bus stops will be moved to other bus corridors including Elizabeth, Castlereagh, Park, Druitt, Clarence and Yorks streets.