Chinese? Heard got avg got 20% dropout rate.. My march bto is 25% or more liao..
Yeah chinese. Really hope can get the hougang although low chance ar becuz its like one min walk away from my gf parents place.

Chinese? Heard got avg got 20% dropout rate.. My march bto is 25% or more liao..
I got queue 26 for 3 room Jurong! Aiming for the block facing highway too. my dream unit is on 15 floor. so HI NEIGHBOUR!!! hahahaha
I am not sure whether they will be announcing or not. There are other forums discussing and updating on the possible location for NS12. I was hoping that hdb will update the sembawang area map with ns12 location.
What block u aiming?i got queue 16 for 3 room. maybe we could be neighbour heehaa
If you see the annoucement on NS12, can post here?
In case i miss out. Thanks.
no opt for any priority scheme?
Thanks for the link.. wow 2030...by then i will be v old liao =(
Thanks for the link.. wow 2030...by then i will be v old liao =(
Thanks for the link.. wow 2030...by then i will be v old liao =(
I don't think it will take so long to build ns12. I don't have credible source but from what I read,
Someone said tender was closed on 27/3/2013 for ns12 here
[Poll] MRT NS12 - Do you want it built by 2015? - Page 27 - CONDOsingapore.com - Singapore Condo Property Forum | Discussion | Reviews | Pictures | New Launches | Construction Updates
And other forumer said that he saw the sign board that states LTA awarded the tender to build ns12 already.
Yishun or Sembawang Pte property worth investing - Page 62 - CONDOsingapore.com - Singapore Condo Property Forum | Discussion | Reviews | Pictures | New Launches | Construction Updates
Both are different forum threads. My guess is the mrt will be up before our bto is ready. I don't think they will need 5years to build one more station. So now is only the location that we really need to find out.
any idea when will results of SOBF be out?
End of July..
They should build it in time I feel, if they do it together with the BTO.
Depends on the urgency I guess.