Anyone know why Sengkang and Punggol flats are moving so much faster than KW and getting more appointments per day than KW?... double standard...

It's because punggol and sk have a history of high drop out. So usually pungol and sengkang will move fast fast in the beginning but always the last to end because usually selection have to go until the last Q number and there's still some flats left.

Punggol Waterway East | Facebook
 
Last edited:

wilfred

Member
Joined
Jan 1, 2000
Messages
299
Reaction score
0
so meaning, if it does not hit 70% and above, HDB will just put the whole project on-hold? any past such examples?

In the past there were only 5 cases when hdb abandoned it after not meeting 70%. Sembawang Flowing Grrenery in 2001, Punggol Sundial and Sembawang Springlodge in 2003, Punggol Anthias and Sengkang Coral Green in 2004. After that, never have cases of take up rate less than 70%.



Punggol Waterway East | Facebook
 
Last edited:

Mihozz

Junior Member
Joined
Jun 27, 2012
Messages
58
Reaction score
0
In the past there were only 5 cases when hdb abandoned it after not meeting 70%. Sembawang Flowing Grrenery in 2001, Punggol Sundial and Sembawang Springlodge in 2003, Punggol Anthias and Sengkang Coral Green in 2004. After that, never have cases of take up rate less than 70%.



Punggol Waterway Sundew | Facebook

Given that KW is really central located and not many chances to get BTO in these areas, hope ppl do make it to 70%, otherwise it's so wasteful...
 

j3ffr3y

Senior Member
Joined
Jun 29, 2004
Messages
887
Reaction score
0
Pls correct me if I m wrong.. I tot hdb has changed the policy to have all bto built regardless take-up rate?
 

ah_cheng1882

Senior Member
Joined
Nov 25, 2006
Messages
1,819
Reaction score
32
source? The term 'BTO' (Built To ORDER) already suggests they will not commence construction if the demand is below a certain level.

However, with such high demand in recent years, they may go ahead to build even with slightly lower take-up rate. The unsold units may then be handled via the balance flats mechanism.

Pls correct me if I m wrong.. I tot hdb has changed the policy to have all bto built regardless take-up rate?
 

jareon81

Member
Joined
Jul 4, 2012
Messages
154
Reaction score
0
j3ffr3y is actually correct. Khaw has told the HDB in May 2011 to build ahead of demand.

"SINGAPORE : National Development Minister Khaw Boon Wan has told HDB to build ahead of demand during this period of robust demand.

Writing in his ministry's blog, Mr Khaw said the orders will definitely come, and HDB should call a tender as soon as architectural drawings and tender documents are ready.

Currently, a tender is called only after 70 per cent of orders have been confirmed - hence "Build-to-Order" (BTO) scheme.

The minister said HDB can return to the usual BTO approach after the situation has stabilised."

Anyway you can just check GeBIZ to see that they are already calling a tender for "Building Works At Kallang Whampoa Contract 20C" published on 22/06/2012 and closing on 03/08/2012 for McNair.
 

wilfred

Member
Joined
Jan 1, 2000
Messages
299
Reaction score
0
j3ffr3y is actually correct. Khaw has told the HDB in May 2011 to build ahead of demand.

"SINGAPORE : National Development Minister Khaw Boon Wan has told HDB to build ahead of demand during this period of robust demand.

Writing in his ministry's blog, Mr Khaw said the orders will definitely come, and HDB should call a tender as soon as architectural drawings and tender documents are ready.

Currently, a tender is called only after 70 per cent of orders have been confirmed - hence "Build-to-Order" (BTO) scheme.

The minister said HDB can return to the usual BTO approach after the situation has stabilised."

Anyway you can just check GeBIZ to see that they are already calling a tender for "Building Works At Kallang Whampoa Contract 20C" published on 22/06/2012 and closing on 03/08/2012 for McNair.

Yup. For Kallang Whampoa Contract 20C, contract will be awarded somewhere in Nov and expect to see contractor possession of site from Dec 2012.



Punggol Waterway East | Facebook
 
Last edited:

wdblazer

Senior Member
Joined
Jun 21, 2007
Messages
939
Reaction score
0
j3ffr3y is actually correct. Khaw has told the HDB in May 2011 to build ahead of demand.

"SINGAPORE : National Development Minister Khaw Boon Wan has told HDB to build ahead of demand during this period of robust demand.

Writing in his ministry's blog, Mr Khaw said the orders will definitely come, and HDB should call a tender as soon as architectural drawings and tender documents are ready.

Currently, a tender is called only after 70 per cent of orders have been confirmed - hence "Build-to-Order" (BTO) scheme.

The minister said HDB can return to the usual BTO approach after the situation has stabilised."

Anyway you can just check GeBIZ to see that they are already calling a tender for "Building Works At Kallang Whampoa Contract 20C" published on 22/06/2012 and closing on 03/08/2012 for McNair.

I wonder if they have a min cut off before they start the building, cannot be below 50% then still go ahead and build ba?
 

tohguan272

Junior Member
Joined
May 2, 2012
Messages
40
Reaction score
0
Yes they call for tender now and contract will be awarded only when take up rate has met.If only 50% take up rate i dun think they will proceed to build,remember if the next launce still have in kallang and whampoa i think they will adjust the prices lower and you guys will be holding this baby a high price for it.
 

oddeye82

Arch-Supremacy Member
Joined
Feb 19, 2006
Messages
14,834
Reaction score
2,425
My new 18th floor flat at Bendemeer now can't even buy a 2nd floor flat in Bendemeer Light. This is how expensive it has become.
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.