May BTO 2012

melvyndb

Member
Joined
Dec 8, 2008
Messages
143
Reaction score
0
Went there to recce last week, and they have started laying the big blocks of stones and those foundation irons. The mrt station is nearer than i initially thought.. just 2-3 blocks away with sheltered walkways. and god knows why, but i noticed bout 5-6 clinics near MRT. High rate of sick patients?? Haa...

Anyway, still long way to go... earliest key collection date advised by HDB is in 2nd half of 2016...
 

yoohoo

Member
Joined
Jul 24, 2012
Messages
224
Reaction score
1
Went there to recce last week, and they have started laying the big blocks of stones and those foundation irons. The mrt station is nearer than i initially thought.. just 2-3 blocks away with sheltered walkways. and god knows why, but i noticed bout 5-6 clinics near MRT. High rate of sick patients?? Haa...

Anyway, still long way to go... earliest key collection date advised by HDB is in 2nd half of 2016...

u taking the premium one ?
 

dotdotger

Member
Joined
May 19, 2008
Messages
106
Reaction score
0
Sorry for bumping up an old thread!

Calling all neighbours from Punggol edge, please feel free to join the <Punggol Edge> facebook closed group! We are getting to know each other as we start collecting keys :)
 

tanjhj

Supremacy Member
Joined
Dec 14, 2000
Messages
6,131
Reaction score
346
10A getting keys in July (from reliable source)

called hdb recently and spoke to some staff about cement screeding. HDB has allready working on something.
 

Gixxerfied

Greater Supremacy Member
Joined
May 24, 2008
Messages
84,937
Reaction score
2,920
10A getting keys in July (from reliable source)

called hdb recently and spoke to some staff about cement screeding. HDB has allready working on something.

Need to write in to appeal for cement screed for project launched before the new regulation kicked in. Your application if thru sobf also has to be before the regulation kick in in order to have a chance for hdb cement screed.

A few resident from my bto launched in May 2013 has already written in and got approval for hdb screed. But be prepared to push back ur actual renovation..

Above is the sop procedure by hdb..
 

duckie_15

Senior Member
Joined
Jul 30, 2015
Messages
1,306
Reaction score
1
Need to write in to appeal for cement screed for project launched before the new regulation kicked in. Your application if thru sobf also has to be before the regulation kick in in order to have a chance for hdb cement screed.

A few resident from my bto launched in May 2013 has already written in and got approval for hdb screed. But be prepared to push back ur actual renovation..

Above is the sop procedure by hdb..

The regulation kicked in on 01 june 2015 right? My application is May 2015 SBF. Can appeal?
 

Gixxerfied

Greater Supremacy Member
Joined
May 24, 2008
Messages
84,937
Reaction score
2,920
The regulation kicked in on 01 june 2015 right? My application is May 2015 SBF. Can appeal?

Can try but take note,

Regulation was announced in 2014 and was initially suppose to kick in on 1st Dec 2014 and got push back until 01 June 15..

So based on the above, they might not approve your case since it was announced way before ur application.
 

windwaver

High Supremacy Member
Joined
Apr 28, 2000
Messages
34,486
Reaction score
2,842
The regulation kicked in on 01 june 2015 right? My application is May 2015 SBF. Can appeal?

Can try but take note,

Regulation was announced in 2014 and was initially suppose to kick in on 1st Dec 2014 and got push back until 01 June 15..

So based on the above, they might not approve your case since it was announced way before ur application.

duckie, if you managed to get HDB to screed for you you got to take note of the quality of the work; especially how level is it and thickness based on the flooring you want to do up.
 

Gixxerfied

Greater Supremacy Member
Joined
May 24, 2008
Messages
84,937
Reaction score
2,920
duckie, if you managed to get HDB to screed for you you got to take note of the quality of the work; especially how level is it and thickness based on the flooring you want to do up.

:s13:

Ya, the thickness and levelness is something of an issue..

Only can appeal when near taking keys..Once approve and after key collection then go town council or the hdb hub handling ur area to fill up the form and pass them the keys..After that have to wait for 2-4 weeks before they call u up to schedule the screed..Then have to wait again for them to perform the actual work and pray one time swee swee..

Any defects u found during 1st inspection must be rectify and deal with before screed can proceed..
 
Last edited:

duckie_15

Senior Member
Joined
Jul 30, 2015
Messages
1,306
Reaction score
1
:s13:

Ya, the thickness and levelness is something of an issue..

Only can appeal when near taking keys..Once approve and after key collection then go town council or the hdb hub handling ur area to fill up the form and pass them the keys..After that have to wait for 2-4 weeks before they call u up to schedule the screed..Then have to wait again for them to perform the actual work and pray one time swee swee..

Any defects u found during 1st inspection must be rectify and deal with before screed can proceed..

How much will it roughly cost if i get own contractor to do it?
 

Gixxerfied

Greater Supremacy Member
Joined
May 24, 2008
Messages
84,937
Reaction score
2,920
How much will it roughly cost if i get own contractor to do it?

Have to see ur contractor but expected around $2.5k for 40mm thickness screed for 3br + living rm..

Side note for those going to use gas heater or hob, if your id/contractor knows the authorised citygas installer direct then ask them to arrange for you. But you need to go citygas online, purchase the gas heater u need(It would be charged to your utilities bill anyway) and then the next 1-2 days, citygas will call and then email you with the order confirmation number. With this then the pipe installer can proceed to do the installation. Back then no need, recent rules changes. If say u let Citygas to scheduled the piping for you, prepare to wait for at least 2-4 weeks.

One of my future neighbour went thru the long route while my contractor knows the boss of the installer so i just got the heater and order no, gas piping was fix 2 days later after i got the confirmation no. If i went with Citygas arrangement, would be around 2-3 weeks..
 
Last edited:
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.