MyRepublic fibre - Part 4

Status
Not open for further replies.

aptget

Supremacy Member
Joined
May 6, 2001
Messages
8,427
Reaction score
1
Hi Myrepublic,

just gotten my MR setup but dl speed capped at 300 Mbps... any reason?

nwya93.png

try here and post results again

http://speedtest.myrepublic.com.sg/

getting 180Mbps up / 250 down :( (FireFox)

Last night was 600/150 (FireFox)

Retested with IE ~~~ 507/265

damn weird la....
 
Last edited:

qingtian

Supremacy Member
Joined
Jul 13, 2000
Messages
8,146
Reaction score
1
I showed one of our engineers this and he laughed... "We didn't even know there was going to be an article on us today!"

Thanks for the encouragement Henry. We have a few suspicions on the reasons for the inconsistent speed tests, but right now our engineers are more concerned about actual performance of the 1Gbps. Speed tests are an indication, but not a reflection of how they might actually perform.

So for now, they're looking more into things like Android uploading issues. Once that is fixed, we'll look into the Speed test inconsisntencies.

Hi Johnny, I been following various MR threads and your responses.
Being a MR Staff and representative over here in HWZ.
Could you advise is there any ETA in for the resolution of this speed inconsistencies?

Though MR have other priority in having other issues such as solving Android uploading problem but please be reminder that the rest of the consumers that are being in MR subscription at the very moment are not getting the advertised speed.

In this scenario, what would be MR arrangement for this group of customers? I guess MR shouldn't be expecting us to pay for the FULL amount of subscription fee at the end of this month since we are not getting the advertised speed?

FYI, my connection was installed on 28th March and now there are not resolution and improvement to my problem. It had also seem to get worse over the days

You might want to take a look at the speedtest that was done through MR website from the first date of installation vs this afternoon.

28th March 2014
2r3gt9s.jpg


5th April 2014
2it6alc.jpg


It look so ironically that my upload speed now look to be better than my download and my download speed is getting worse? I'm coming in as this conclusion as this is my observations for the past one week which I had been tracking the progress of my problem.

In case you might be given the ideas that it could be problem my Asus router firmware issues. The above result was capture DIRECTLY from the ONT Modem via the CAT 6 cable.

You may wish to advise us what would be the arrangement which I have bring out as highlighted in darkgreen.
 
Last edited:

Johnnny

Member
Joined
Apr 22, 2013
Messages
246
Reaction score
0
Hi qingtian, sorry I believe I might have been not very clear what I meant by "speed test inconsistencies".

I meant specifically for speed tests, which is just a measure by that particularly test route and may not be an actual indication of the potential speed that broadband line can give you. In other words, there are times when speed TEST results are low, but actual speeds remain optimal.

There are a number of reasons why this is so. Speed test routes may be unable to measure 1Gbps properly because they're actually not capable of measuring that speed. Something could be wrong "in between" us and the test server. This is why you're seeing higher upload speeds than download speeds.

So what I meant was - our 1Gbps may not be optimised for *tests* yet, which is different from actual speed.

Hi Johnny, I been following various MR threads and your responses.
Being a MR Staff and representative over here in HWZ.
Could you advise is there any ETA in for the resolution of this speed inconsistencies?

Though MR have other priority in having other issues such as solving Android uploading problem but please be reminder that the rest of the consumers that are being in MR subscription at the very moment are not getting the advertised speed.

In this scenario, what would be MR arrangement for this group of customers? I guess MR shouldn't be expecting us to pay for the FULL amount of subscription fee at the end of this month since we are not getting the advertised speed?

FYI, my connection was installed on 28th March and now there are not resolution and improvement to my problem. It had also seem to get worse over the days

You might want to take a look at the speedtest that was done through MR website from the first date of installation vs this afternoon.

28th March 2014
2r3gt9s.jpg


5th April 2014
2it6alc.jpg


It look so ironically that my upload speed now look to be better than my download and my download speed is getting worse? I'm coming in as this conclusion as this is my observations for the past one week which I had been tracking the progress of my problem.

In case you might be given the ideas that it could be problem my Asus router firmware issues. The above result was capture DIRECTLY from the ONT Modem via the CAT 6 cable.

You may wish to advise us what would be the arrangement which I have bring out as highlighted in darkgreen.
 

xRenol

Supremacy Member
Joined
Dec 27, 2011
Messages
7,243
Reaction score
194
Based on The Straits Times article, it stated that "The Infocomm Development Authority (IDA) said yesterday that it is monitoring OpenNet's obligations to connect 98 per cent of residential sign-ups within three workings days of receiving their orders, and the rest within seven working days."

Does it mean that any postpone/delay from the first installation date will only be a maximum of seven working days for those installation date starting after 5 April 2014?

1923093544d56e9613cf00faaf4a903ef6b19482.jpg
 

YouKilledKenny

Master Member
Joined
Aug 10, 2003
Messages
4,916
Reaction score
19
Based on The Straits Times article, it stated that "The Infocomm Development Authority (IDA) said yesterday that it is monitoring OpenNet's obligations to connect 98 per cent of residential sign-ups within three workings days of receiving their orders, and the rest within seven working days."

Does it mean that any postpone/delay from the first installation date will only be a maximum of seven working days for those installation date starting after 5 April 2014?

1923093544d56e9613cf00faaf4a903ef6b19482.jpg

That would be overly hopeful. In all my communications with OpenNet, they could only tell me they will try to resolve "insufficient fiber capacity" issues within 20 working days (i.e. one month).

For my case, OpenNet didn't show up at the scheduled appointment on 21st March. Subsequently, they showed up outside my house (without prior appointment) on 2nd April and did something to the electrical cabinet outside my house. On 3rd April, MR says OpenNet fixed whatever issues they had and scheduled an installation for me, tomorrow (6th April, was meant to be 26th March).

At least I didn't have to wait 20 working days for OpenNet (only 9 working days, should I be glad?) to get their act together (though I won't know for sure until MR shows up tomorrow, if they do).
 

creator88

Senior Member
Joined
Nov 16, 2007
Messages
576
Reaction score
37
Does it mean that any postpone/delay from the first installation date will only be a maximum of seven working days for those installation date starting after 5 April 2014?

1923093544d56e9613cf00faaf4a903ef6b19482.jpg

Nope. I don't think that SLA refers to delays or postponements.

OpenNet will not provide any timeline for issue rectification whatsoever. They will only let you know once it is rectified, not any earlier.

That's the painful truth I'm afraid. If you are not satisfied with the situation, I suggest you write in IDA / MCI to complain. I did.
 

Lehnsherr

Supremacy Member
Joined
Feb 19, 2001
Messages
5,312
Reaction score
49
Why does this capacity issue come into picture now? Fibre connection has been around for a couple of years liao how come now they have this capacity issues.

I mean I don't really get what it is all about.
 

nivleK1985

Senior Member
Joined
Feb 20, 2005
Messages
1,710
Reaction score
0
Why does this capacity issue come into picture now? Fibre connection has been around for a couple of years liao how come now they have this capacity issues.

I mean I don't really get what it is all about.

there's 2 port to each house.

But opennet is only required to ensure 1 is connected to the backend system.

Thus, when customer sign up for 2nd connection. they would need to build an additional cable from your house to the back end system.

But since the backend system is only designed to handle 1 line from each house. They would need to build additional ports in the backend system for that area.

OpenNet will only increase the number of backend system if they found on the day of installation that there isn't enough and they will cancel the appointment to do so.

So it's a oversight of the fiber planning project.
 

nivleK1985

Senior Member
Joined
Feb 20, 2005
Messages
1,710
Reaction score
0
Based on The Straits Times article, it stated that "The Infocomm Development Authority (IDA) said yesterday that it is monitoring OpenNet's obligations to connect 98 per cent of residential sign-ups within three workings days of receiving their orders, and the rest within seven working days."

Does it mean that any postpone/delay from the first installation date will only be a maximum of seven working days for those installation date starting after 5 April 2014?

1923093544d56e9613cf00faaf4a903ef6b19482.jpg

98% refers to successful one, totally no issue. Not inclusive of any that they rejected or cancel for any reason.

i would say 3 days to 7days is too long even if it's 100% successful.

Will release more details on this soon.
 

Lehnsherr

Supremacy Member
Joined
Feb 19, 2001
Messages
5,312
Reaction score
49
there's 2 port to each house.

But opennet is only required to ensure 1 is connected to the backend system.

Thus, when customer sign up for 2nd connection. they would need to build an additional cable from your house to the back end system.

But since the backend system is only designed to handle 1 line from each house. They would need to build additional ports in the backend system for that area.

OpenNet will only increase the number of backend system if they found on the day of installation that there isn't enough and they will cancel the appointment to do so.

So it's a oversight of the fiber planning project.

So how does it affect subscribers? people sign up then Opennet is unable to terminate the existing connection in time for subscribers to switch to the new one?
 

nivleK1985

Senior Member
Joined
Feb 20, 2005
Messages
1,710
Reaction score
0
So how does it affect subscribers? people sign up then Opennet is unable to terminate the existing connection in time for subscribers to switch to the new one?

For our own customer. We can easily terminate the old line in the morning and use that line to connect to our services.

For new customer, if the current provider refuse to let go of that line we will need to use that 2nd line. But if there's not enough back end plugs for a 2nd hand. We will need to wait and thus the delay.
 

Lehnsherr

Supremacy Member
Joined
Feb 19, 2001
Messages
5,312
Reaction score
49
For our own customer. We can easily terminate the old line in the morning and use that line to connect to our services.

For new customer, if the current provider refuse to let go of that line we will need to use that 2nd line. But if there's not enough back end plugs for a 2nd hand. We will need to wait and thus the delay.

lol. I see.

But I still don't get it why now we get this problem but not last time. Don't tell me last time nobody is switching providers and suddenly this year everyone starts to switch?
 

nivleK1985

Senior Member
Joined
Feb 20, 2005
Messages
1,710
Reaction score
0
lol. I see.

But I still don't get it why now we get this problem but not last time. Don't tell me last time nobody is switching providers and suddenly this year everyone starts to switch?
Last time not everyone using fiber. Thus there may be spare plug like if this family not using fiber. We can unplug them and plug in another one. But when we launch 1gbps we create a massive impact on the market and everyone is switching to MyRepublic. That's where the issue comes in. And this is also the period where most people 2 year contract is up.
 
Status
Not open for further replies.
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.
Top