Clementi GateWay

Clement08

Junior Member
Joined
Oct 26, 2008
Messages
89
Reaction score
0
last wed went to Bukit Merah C C register replacement flat, many neighbour asked me why i came ? i still need to submit then SERS will post me to Clementi...feel sad to say bye bye to redhill...:(

After living in redhill for so many yrs, u sure to feel sad to leave the place. 20+ yrs ago, I was staying at Commonwealth, I stayed Commonwealth for 28 yrs. Now sometimes occassionally, I still go back to my old old place to look at my old old hse (hse dun belong to me long time ago, but the floor tiles, window wall side tiles which was done by late father and the metal gate still remains). I recalled the past days while standing on the common corridor outside the flat. So much changes to the old old flat, 1 extra room was built at the kitchen, the grass field in front of the flat was now cemented. The lift goes to all levels. They are so much changes to the enviorment. Times ready flies. Hai :(:(:(

Look like HDB is slowing down in building the replacement flats. I notice my old flat (Clementi) the area is fenced up, window and aircon all removed. The temp bus interchange partially removed.
 

chuan chuan

Member
Joined
Sep 3, 2012
Messages
257
Reaction score
0
After living in redhill for so many yrs, u sure to feel sad to leave the place. 20+ yrs ago, I was staying at Commonwealth, I stayed Commonwealth for 28 yrs. Now sometimes occassionally, I still go back to my old old place to look at my old old hse (hse dun belong to me long time ago, but the floor tiles, window wall side tiles which was done by late father and the metal gate still remains). I recalled the past days while standing on the common corridor outside the flat. So much changes to the old old flat, 1 extra room was built at the kitchen, the grass field in front of the flat was now cemented. The lift goes to all levels. They are so much changes to the enviorment. Times ready flies. Hai :(:(:(

Look like HDB is slowing down in building the replacement flats. I notice my old flat (Clementi) the area is fenced up, window and aircon all removed. The temp bus interchange partially removed.

that why i take BTO, sers flat very slow...
 

Clement08

Junior Member
Joined
Oct 26, 2008
Messages
89
Reaction score
0
The SERS unit are slated to be ready only in 2016
Hence it is still early, just a small area, unlike the Casa clementi.
They are in no rush anyway...


The new condo at Jalan Lempang is set for Dec/Jan release..
Name: TrilinQ.

Clementi New Housing Development | Flickr - Photo Sharing!

I think the reason why they slow down is because of rainy season now. They only have 3 and a half year to built. They need to demolish the old building, test the soil, putting heavy blocks of stones here and there, before they can lay the foundation. These were take them half a year.
 

wwwwwQ

Member
Joined
Aug 7, 2010
Messages
262
Reaction score
0
The new Condo "TRILLINQ" next to Nan Hua Pri will comprise of 3 Towers of 36 storey high.

Those who bought BLK 208A, the chance of a seaview will be further reduced with these towering developments like Trillinq and Cascadia Clementi.
 

lampano

High Supremacy Member
Joined
Jan 9, 2007
Messages
29,740
Reaction score
12,127
Aiya ....no guarantee seaview with years to come. just some new SERS to come in west coast and new development beside cascadia will block major views :s22:

BTW the new condo..goodness, next to mrt, school, expressway... sure damm noisy for sure
 

chuan chuan

Member
Joined
Sep 3, 2012
Messages
257
Reaction score
0
what you mean by no tender close? You mean no tenderer bid for the work?

ya..i check on the HDB tender, on the same closing date 19nov got 6 projects, clementi gateway is not in the list...if no body bid then how?
 
Last edited:

wwwwwQ

Member
Joined
Aug 7, 2010
Messages
262
Reaction score
0
Finally it has been awarded :s12:
The winning builder is Koon Seng Construction Pte Ltd... looking forward to commencement of construction on site soon!
 

chuan chuan

Member
Joined
Sep 3, 2012
Messages
257
Reaction score
0
Finally it has been awarded :s12:
The winning builder is Koon Seng Construction Pte Ltd... looking forward to commencement of construction on site soon!

justnow i saw the grasshoppers jumping:s12:....they start cutting the grass today...
 

wwwwwQ

Member
Joined
Aug 7, 2010
Messages
262
Reaction score
0
Saw some excavation work on site yesterday. They have created an opening access between the two temples at the end of Clementi Service Road. The hoarding will be up very soon. :)
 
Important Forum Advisory Note
This forum is moderated by volunteer moderators who will react only to members' feedback on posts. Moderators are not employees or representatives of HWZ Forums. Forum members and moderators are responsible for their own posts. Please refer to our Community Guidelines and Standards and Terms and Conditions for more information.
Top