j4jersey.
Master Member
- Joined
- Oct 25, 2014
- Messages
- 4,476
- Reaction score
- 1,272
i did a google search and this is from a reno website. (to validate the reply i got from SE)where is this from?
my friend who doing a landed reno (they must do LEW inspection unlike HDB) and their contractor said SP will fail it if inspector find neutral wire, contractor said if die die want to do , have to hide the neutral first, after pass inspection then install smart switch.
i got reply from schneieder electric and their system integrater , for their wiser system which need neutral wire, will fail LEW inspection.