You must check every area including hidden area within 7Days after rectification 14D you need to check on e rectification that won’t take 14D
You must check the following too:
1. All windows hinges no rust (they’ve changed all my hinges)
2. Outside window external wall no cracks, chipped walls, scratch, (mine fixed)
3. Front gate hinges colour are consistent if it’s not, get them to clean it.
4. Lock on top and bottom of main door side has even holes, lock on main door is new
4. Wall tiles & underneath the switches no chipped tiles - this is very common (mine fixed)
Mainly a lot of hidden areas you’ll need to check.
You must check the following too:
1. All windows hinges no rust (they’ve changed all my hinges)
2. Outside window external wall no cracks, chipped walls, scratch, (mine fixed)
3. Front gate hinges colour are consistent if it’s not, get them to clean it.
4. Lock on top and bottom of main door side has even holes, lock on main door is new
4. Wall tiles & underneath the switches no chipped tiles - this is very common (mine fixed)
Mainly a lot of hidden areas you’ll need to check.
4 room K/W.
At first we only spotted 3 defects, tap no water, wall titles in toilet got scratch, leak sink, then later on my ID went up, she told us those rust, dirt etc oso can ask them to touch up.
The day before HDB oic came for site visit, we check again, then realised some of the kitchen / toilet titles are hollow, window lock crack, toilet seat not fixed properly and some other minor things, we feedback to them, they said will get it rectified. But for the hollow titles, at the site visit, they checked and told us only 2 are really hollow and they will get it replace within 14 days. Hopefully before CNY all rectification can be done.