
Modern electric trains especially in urban networks are highly dependent on each other due to regenerative braking.
They usually use the braking of one train to help accelerate the other train away from the station.
That’s why you cannot simultaneously start all trains along the line, usually trains are progressively added to the line.
It seems like they tried to divert power from the circle line and overloaded that circuit.
Some countries with older networks are still buying diesel electric trains for greater reliability.
They can consider buying a small fleet of diesel electric to use during the weekends along with reduced hours for more maintenance to be done.
best part is one error can knock out the whole art systemDuno what’s wrong. Our network like so vulnerable. Damn cui leh
best part is one error can knock out the whole art system
kinda show our mrt system has no redundancies built in, aka built to fail.......
I think tuck yew and ye kung is some of the most humble ministers
Such a poor handling. Call Khaw that cow back better
Yes. Saw too. Think no sleep last nite.Just now news.. See oyk.. Eyes swollen.. Must be nv sleep last night.
Agreed....I think tuck yew and ye kung is some of the most humble ministers
to be honest, the handling was bad. should have free buses and better management.
This sounds very logical but at the same time very evil.though hindsight is **** of a thing to bring up
wonder if they ever considered reducing service hours or even partial shutdown of train lines for maintenance during earlier ** phase 1 and 2...
track related maintenance is like race against time.
service crew probably can only start work at 12:30am, but must finish and clear and run reliability checks by 5 am... those 5 hours in the dark have to squeeze the max work done, also subjected to CAT1
This sounds very logical but at the same time very evil.
Office workers lives and comfort are so important that essential workers have to risk their lives to do non essential maintenance?