Just to share experience of my installation :
a. Booking via OpenNet website was done on the 02Sep for installation date of 29Sep 1100-1300h (today).
b. Confirmation email and SMS was issued. Same confirmation SMS was received on Thu 27Sep.
c. OpenNet team of 2 came approx 1145h and started discussing the termination point box location. As self had reviewed with Ayub before, the TP box is to be fix in the distribution box space, which is just next to the main door.
OpenNet advice as per procedure is to install the TP box next to TV with power point.
d. Inform OpenNet team of my decided location and checkout on the fiber cable entry point.
Unfortunately, the initial plan for gas piping entry point was found cement sealed and cutting up the false ceiling is too big a job.
e. Drilling thru the main doorway wall is the simplest option and same were done for other units in my block.
f. Cable was inserted and pulled to the distribution box space. Short cable duct was used. In the distribution box space, flexible hose was used instead for well.. "flexibility".
Requested for a little longer fiber cable for again flexibility in TP box shifting if required in future (I know it will be my risk).
I guess my utilization of the free fiber cable was less than 2 meters from entry point to TP box.
g. TP box is fixed to a high point as I have planned to install a shelf with power points. The ONT, routers and what not will be placed on the shelf.
h. One of the team helps to sweep the debris off and the other guy packs up. The installation team left and the OpenNet testing guy came. During the cable installation time, the testing guy was fixing up the sub-distro box at block main cable trunk.
Apparently my unit is the first to install OpenNet on that floor.
The team leader requested to sign his completion papers. Inquire about the connection testing and assured it is a simple job and will be done. Signed his paper and he left promptly. Saturday and mooncake festival I reckon...
i. Testing guy spliced and joined the fiber cable end to the socket. He called up OpenNet to activate the test. Showed me the "red" dot from the socket "1".
Test measurement :
1310nm - 0.50
1490nm - 0.38
1550nm - 0.30
Guess the results are pretty ok.
j. All OpenNet team gone by 1240h, left myself to square up everything, cleanup the walls, ceilings and floors...
Next phase is to wait for Ayub come over to do the LAN sockets and power points. My existing phone panels/sockets will be replaced with LAN faceplates. Fortunately the existing phone line is already of CAT5E cable, hence no unsightly pulling of cables. The home phone lines had never been commissioned before.
Finally need to decide on fiber service provider...
Cheers....