If there is no TP installed, then MR has to make an arrangement with OpenNet to install the TP (at an additional charge) first before the installation. Thus, the lead time will definitely be longer depending on OpenNet schedule.
Normally the TP is installed beside the TV point so just double check again.
Which ISP are you using for your Internet?
Now Opennet change the approach already.
They can just state fibre ready to your building but no TP installed in the unit. Only when u sign up service from RSP, Opennet will then come and install TP for you. Yes, still free for first 15m.
May be new way to stop wastage as TP installed but then never utilize in the end.